Chapter 23
Overweight Non-Divisible Load Provisions
PERMIT FEE SCHEDULE
| Combination Oversize/Overweight Non-Divisible Load Permits up to 125,000 GVW are available when both size and weight restrictions are met: |
| Single Trip |
$60.00 |
| Semi-Annual (180 Days) |
-- |
| 80,001-84,000 pounds |
$180.00 |
| 84,001-112,000 pounds |
$320.00 |
| 112,001-125,000 pounds |
$420.00 |
| Annual (365 Days) |
-- |
| 80,001-84,000 pounds |
$240.00 |
| 84,001-112,000 pounds |
$480.00 |
| 112,001-125,000 pounds |
$540.00 |
| Combination Overweight / Oversize Load Permits Exceeding 125,000 Pounds GVW |
| Minimum |
$65.00 |
| Maximum |
$450.00 |
Note: Overweight/Oversize permit fees for vehicles with a GVW in excess of 125,000 pounds are determined by the following table. Actual weights and miles shall be rounded to the next higher increment.UCA 72-7-406(7)(c)(i)(ii)
Fee Table for Non-Divisible Loads Exceeding 125,000 lbs. gross weight
| Miles |
50 |
100 |
150 |
200 |
250 |
300 |
350 |
400 |
450 |
500 |
550 |
600 |
650 |
| Pounds |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 150,000 |
$80 |
$80 |
$130 |
$170 |
$210 |
$250 |
$290 |
$340 |
$380 |
$420 |
$460 |
$500 |
$540 |
| 175,000 |
$80 |
$110 |
$170 |
$230 |
$290 |
$340 |
$400 |
$460 |
$510 |
$540 |
|
|
|
| 200,000 |
$80 |
$140 |
$220 |
$290 |
$360 |
$430 |
$500 |
$540 |
|
|
|
|
|
| 225,000 |
$90 |
$170 |
$260 |
$350 |
$440 |
$520 |
$540 |
|
|
|
|
|
|
| 250,000 |
$100 |
$200 |
$310 |
$410 |
$510 |
$540 |
|
|
|
|
|
|
|
| 275,000 |
$120 |
$230 |
$350 |
$470 |
$540 |
|
|
|
|
|
|
|
|
| 300,000 |
$130 |
$260 |
$400 |
$530 |
|
|
|
|
|
|
|
|
|
| 325,000 |
$150 |
$290 |
$440 |
$540 |
|
|
|
|
|
|
|
|
|
| 350,000 |
$160 |
$320 |
$490 |
|
|
|
|
|
|
|
|
|
|
| 375,000 |
$180 |
$350 |
$530 |
|
|
|
|
|
|
|
|
|
|
| 400,000 |
$190 |
$380 |
$540 |
|
|
|
|
|
|
|
|
|
|
| 425,000 |
$210 |
$410 |
|
|
|
|
|
|
|
|
|
|
|
| 450,000 |
$220 |
$420 |
|
|
|
|
|
|
|
|
|
|
|
| 475,000 |
$240 |
$470 |
|
|
|
|
|
|
|
|
|
|
|
| 500,000 |
$250 |
$500 |
|
|
|
|
|
|
|
|
|
|
|
| 525,000 |
$270 |
$530 |
|
|
|
|
|
|
|
|
|
|
|
| 550,000 |
$280 |
$540 |
|
|
|
|
|
|
|
|
|
|
|
| 575,000 |
$300 |
|
|
|
|
|
|
|
|
|
|
|
|
| 600,000 |
$310 |
|
|
|
|
|
|
|
|
|
|
|
|
| 625,000 |
$330 |
|
|
|
|
|
|
|
|
|
|
|
|
| 650,000 |
$340 |
|
|
|
|
|
|
|
|
|
|
|
|
| 675,000 |
$360 |
|
|
|
|
|
|
|
|
|
|
|
|
| 700,000 |
$370 |
|
|
|
|
|
|
|
|
|
|
|
|
| 725,000 |
$390 |
|
|
|
|
|
|
|
|
|
|
|
|
| 750,000 |
$400 |
|
|
|
|
|
|
|
|
|
|
|
|
| 775,000 |
$420 |
|
|
|
|
|
|
|
|
|
|
|
|
| 800,000 |
$430 |
|
|
|
|
|
|
|
|
|
|
|
|
| 825,000 |
$450 |
|
|
|
|
|
|
|
|
|
|
|
|
| 850,000 |
$460 |
|
|
|
|
|
|
|
|
|
|
|
|
| 875,000 |
$480 |
|
|
|
|
|
|
|
|
|
|
|
|
| 900,000 |
$490 |
|
|
|
|
|
|
|
|
|
|
|
|
| 925,000 |
$510 |
|
|
|
|
|
|
|
|
|
|
|
|
| 950,000 |
$520 |
|
|
|
|
|
|
|
|
|
|
|
|
| 950,000+ |
$540 |
|
|
|
|
|
|
|
|
|
|
|
|
Permitted vehicles must comply with the following conditions:
- All vehicles and/or loads shall be reduced to the minimum practical dimensions.
- A permit for non-divisible loads will indicate the axle and gross weight authorized.
OVERWEIGHT NON-DIVISIBLE LOADS
An overweight non-divisible load permit may be issued for moving a combination of vehicles and loads exceeding the legal limits under the following conditions:
- The vehicle or combination of vehicles is properly registered for 78,001 to 80,000 pounds or equal to or greater than the gross vehicle weight.
- Movement of overweight non-divisible loads shall meet requirements specified under rail crossings UCA 41-6a-1205.
- The allowable speed, when crossing structures, shall not exceed 45 mph, or as indicated on the permit.
- Permits may be obtained at ports of entry located throughout the state upon entry or through the Motor Carrier Division. Contact information can be found in the Utah Agency Directory Section or by contacting the Motor Carrier Division at (801) 965-4892 or (866) 215-5399.
Permits are required prior to entering except when entering on I-15 near St. George and I-80 near Echo and Wendover.
Chapter 23
Overweight Non-Divisible Load Provisions
PERMIT FEE SCHEDULE
| Combination Oversize/Overweight Non-Divisible Load Permits up to 125,000 GVW are available when both size and weight restrictions are met: |
| Single Trip |
$60.00 |
| Semi-Annual (180 Days) |
-- |
| 80,001-84,000 pounds |
$180.00 |
| 84,001-112,000 pounds |
$320.00 |
| 112,001-125,000 pounds |
$420.00 |
| Annual (365 Days) |
-- |
| 80,001-84,000 pounds |
$240.00 |
| 84,001-112,000 pounds |
$480.00 |
| 112,001-125,000 pounds |
$540.00 |
| Combination Overweight / Oversize Load Permits Exceeding 125,000 Pounds GVW |
| Minimum |
$65.00 |
| Maximum |
$450.00 |
Note: Overweight/Oversize permit fees for vehicles with a GVW in excess of 125,000 pounds are determined by the following table. Actual weights and miles shall be rounded to the next higher increment.UCA 72-7-406(7)(c)(i)(ii)
Fee Table for Non-Divisible Loads Exceeding 125,000 lbs. gross weight
| Miles |
50 |
100 |
150 |
200 |
250 |
300 |
350 |
400 |
450 |
500 |
550 |
600 |
650 |
| Pounds |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 150,000 |
$80 |
$80 |
$130 |
$170 |
$210 |
$250 |
$290 |
$340 |
$380 |
$420 |
$460 |
$500 |
$540 |
| 175,000 |
$80 |
$110 |
$170 |
$230 |
$290 |
$340 |
$400 |
$460 |
$510 |
$540 |
|
|
|
| 200,000 |
$80 |
$140 |
$220 |
$290 |
$360 |
$430 |
$500 |
$540 |
|
|
|
|
|
| 225,000 |
$90 |
$170 |
$260 |
$350 |
$440 |
$520 |
$540 |
|
|
|
|
|
|
| 250,000 |
$100 |
$200 |
$310 |
$410 |
$510 |
$540 |
|
|
|
|
|
|
|
| 275,000 |
$120 |
$230 |
$350 |
$470 |
$540 |
|
|
|
|
|
|
|
|
| 300,000 |
$130 |
$260 |
$400 |
$530 |
|
|
|
|
|
|
|
|
|
| 325,000 |
$150 |
$290 |
$440 |
$540 |
|
|
|
|
|
|
|
|
|
| 350,000 |
$160 |
$320 |
$490 |
|
|
|
|
|
|
|
|
|
|
| 375,000 |
$180 |
$350 |
$530 |
|
|
|
|
|
|
|
|
|
|
| 400,000 |
$190 |
$380 |
$540 |
|
|
|
|
|
|
|
|
|
|
| 425,000 |
$210 |
$410 |
|
|
|
|
|
|
|
|
|
|
|
| 450,000 |
$220 |
$420 |
|
|
|
|
|
|
|
|
|
|
|
| 475,000 |
$240 |
$470 |
|
|
|
|
|
|
|
|
|
|
|
| 500,000 |
$250 |
$500 |
|
|
|
|
|
|
|
|
|
|
|
| 525,000 |
$270 |
$530 |
|
|
|
|
|
|
|
|
|
|
|
| 550,000 |
$280 |
$540 |
|
|
|
|
|
|
|
|
|
|
|
| 575,000 |
$300 |
|
|
|
|
|
|
|
|
|
|
|
|
| 600,000 |
$310 |
|
|
|
|
|
|
|
|
|
|
|
|
| 625,000 |
$330 |
|
|
|
|
|
|
|
|
|
|
|
|
| 650,000 |
$340 |
|
|
|
|
|
|
|
|
|
|
|
|
| 675,000 |
$360 |
|
|
|
|
|
|
|
|
|
|
|
|
| 700,000 |
$370 |
|
|
|
|
|
|
|
|
|
|
|
|
| 725,000 |
$390 |
|
|
|
|
|
|
|
|
|
|
|
|
| 750,000 |
$400 |
|
|
|
|
|
|
|
|
|
|
|
|
| 775,000 |
$420 |
|
|
|
|
|
|
|
|
|
|
|
|
| 800,000 |
$430 |
|
|
|
|
|
|
|
|
|
|
|
|
| 825,000 |
$450 |
|
|
|
|
|
|
|
|
|
|
|
|
| 850,000 |
$460 |
|
|
|
|
|
|
|
|
|
|
|
|
| 875,000 |
$480 |
|
|
|
|
|
|
|
|
|
|
|
|
| 900,000 |
$490 |
|
|
|
|
|
|
|
|
|
|
|
|
| 925,000 |
$510 |
|
|
|
|
|
|
|
|
|
|
|
|
| 950,000 |
$520 |
|
|
|
|
|
|
|
|
|
|
|
|
| 950,000+ |
$540 |
|
|
|
|
|
|
|
|
|
|
|
|
Permitted vehicles must comply with the following conditions:
- All vehicles and/or loads shall be reduced to the minimum practical dimensions.
- A permit for non-divisible loads will indicate the axle and gross weight authorized.
OVERWEIGHT NON-DIVISIBLE LOADS
An overweight non-divisible load permit may be issued for moving a combination of vehicles and loads exceeding the legal limits under the following conditions:
- The vehicle or combination of vehicles is properly registered for 78,001 to 80,000 pounds or equal to or greater than the gross vehicle weight.
- Movement of overweight non-divisible loads shall meet requirements specified under rail crossings UCA 41-6a-1205.
- The allowable speed, when crossing structures, shall not exceed 45 mph, or as indicated on the permit.
- Permits may be obtained at ports of entry located throughout the state upon entry or through the Motor Carrier Division. Contact information can be found in the Utah Agency Directory Section or by contacting the Motor Carrier Division at (801) 965-4892 or (866) 215-5399.
Permits are required prior to entering except when entering on I-15 near St. George and I-80 near Echo and Wendover.
SINGLE, SEMI ANNUAL, ANNUAL TRIP PERMITS FOR OVERWEIGHT NON-DIVISIBLE LOADS
Vehicles with a gross vehicle weight of less than 125,000 may be permitted on a single, semi annual, or annual basis as described below:
| Single Axle |
29,500 lbs |
| Tandem Axle |
50,000 lbs |
| Tridem Axle |
61,750 lbs |
| Trunnion Axle |
60,000 lbs |
| Gross Weight |
125,000 lbs |
The above weights are for general reference. Actual weight must comply with Bridge Table allowances.
OVERWEIGHT NON-DIVISIBLE LOADS EXCEEDING 125,000 LBS
Loads exceeding 125,000 lbs, or axle weights shown in above table, may only purchase single trip permits. Axle, bridge, and gross weight allowances will be determined based on the Utah Non-Divisible Bridge Analysis based on formula ~1.47 x 500 (LN/N-1 + 12N + 36) or in accordance with the bridge table. (See Bridge Table Calculations Section)
Note:
- 9' wide axles are allowed 7.5% more weight than 8' wide axles.
- 10' wide axles are allowed 15% more weight than 8' wide axles.
- When using an axle equipped with eight tires, rather than four, add 10% to the weight authorized for an 8' wide axle group.
WEATHER TRAVEL RESTRICTIONS
49 CFR 392.14
Extreme caution in the operation of a commercial motor vehicle shall be exercised when hazardous conditions are present, such as those caused by snow, ice, sleet, fog, mist, rain, dust, or smoke, adversely affect visibility or traction. Speed shall be reduced when such conditions exist. If conditions become sufficiently dangerous, the operation of the commercial motor vehicle shall be discontinued and shall not be resumed until the commercial motor vehicle can be safely operated. Whenever compliance with the foregoing provisions of this rule increases hazard to passengers, the commercial motor vehicle may be operated to the nearest point at which the safety of passengers is assured.
TRAVEL LANE RESTRICTIONS
UCA 41-6a-702
Left Lane Travel Restrictions
A person may not operate a vehicle in the left-most lane or High Occupancy Vehicle (HOV) lanes if:
- Vehicle is drawing a trailer or semi trailer regardless of size, or
- Vehicle or combination of vehicle has a gross vehicle weight of 12,001 or more pounds.
- Left most lane when three or more lanes exist in the direction of travel.
Right Lane Travel Restrictions
- Permitted non-divisible vehicles shall be driven in the right-most lane of traffic, except where the right lane must exit.
- When overtaking and passing another vehicle, permitted non-divisible vehicles shall be driven to the immediate left of the right-most lane returning to the right most lane as soon as feasible
- If right-most lane is designated as an "auxiliary" lane, vehicles shall operate in the center lane until the "auxiliary" lane ends.
ADDITIONAL INFORMATION
For further information regarding Overweight Non-Division Permit Provisions contact the Motor Carrier Division at (801) 965-4892 or (866) 215-5399, or the closest Port of Entry. Contact information can be found in the Utah Agency Directory Section, or by emailing mccustomerservice@utah.gov.